The final phase of the updated Lawrence Berkley National Laboratory (LBNL) and the Building Commissioning Association (BCxA) study on building commissioning is finished and the summary has been published (access it here).

Building commissioning has continued to evolve and mature, and the latest data backs up the positive ROI and energy saving outcomes it promises. The cost of commissioning has dropped considerably.

The case for building commissioning (both existing building and new construction commissioning) is stronger than ever!

New construction commissioning (NCCx) non-energy related benefits:

A red arrow pointing to the right with a no sign on it.

Existing building (EBCx) simple payback:

A red arrow pointing to the right with a no sign on it.

More To Explore

BLUERITHM STAFF AUGMENTATION
Commissioning

Beyond Automation: Why Human Expertise Still Matters in Commissioning Management

In today’s fast-paced commissioning management landscape, automation is revolutionizing how teams work. At Bluerithm, we’re proud of how our software eliminates countless manual tasks and streamlines workflows for small and large firms alike. However, we’ve noticed something interesting: even with

BETTER CHOICE BONUS - BLUERITHM
Uncategorized

Better Choice Bonus: Save When You Switch

When you switch to Bluerithm from a competing commissioning software, you not only get a better platform, you also save big with a 50% discount off the first year fees.  Ready to upgrade your commissioning management experience? Switch to Bluerithm

A page of pictures with various electrical equipment.

Customizable site visit report templates with options to track as standalone activities, or to incorporate into the issues log.

A page of the terapig data center design review.

Customizable design review templates with options to track as standalone activities, or to incorporate into the issues log.

A page of meeting records with two columns.

Customizable meeting minute templates.

A series of images showing the various types of reports.

TAB templates for custom forms with formulas that you can create and edit. 

A screenshot of two different pages with the same page.

Functional and integrated systems tests / level 4 and 5 forms for commercial commissioning. 

Virtually unlimited formats to support your unique needs. 

A series of three different pages with the same page in front.

Pre-functional / level 2 and 3 checklists for commercial commissioning, installation and startup tracking.

A bunch of different types of data in the same page.

Bluerithm has LEED process checklists to ensure you’re on track with your LEED certification requirements, as well as checklist and test forms so you can meet Fundamental and Enhanced LEED certification requirements.

A bunch of different pages of an article

Bluerithm has extensive templates ready to use and customize for a variety of commercial commissioning needs. 

A screenshot of the dashboard showing all the different sections.

Bluerithm has comprehensive punch list and issue log features to support thorough recording, tracking, and control workflows. New items and responses can be easily added on mobile devices in the field, even when offline. 

Issues are customizable on a project by project basis with custom fields.